User manual PENTAX V-227
DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!
If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual PENTAX V-227. We hope that this PENTAX V-227 user guide will be useful to you.
You may also download the following manuals related to this product:
PENTAX V-227 (21463 ko)
PENTAX V-227 BROCHURE (622 ko)
PENTAX V-227 BROCHURE (621 ko)
PENTAX V-227 BROCHURE (621 ko)
PENTAX V-227 BROCHURE (621 ko)
PENTAX V-227 BROCHURE (622 ko)
PENTAX V-227 BROCHURE (621 ko)
PENTAX V-227 QUICK REFERENCE GUIDE (27850 ko)
PENTAX V-227 QUICK REFERENCE GUIDE (26862 ko)
PENTAX V-227 QUICK REFERENCE GUIDE (27307 ko)
PENTAX V-227 QUICK REFERENCE GUIDE (27054 ko)
PENTAX V-227 QUICK REFERENCE GUIDE (27148 ko)
PENTAX V-227 QUICK REFERENCE GUIDE (28034 ko)
PENTAX V-227 QUICK REFERENCE GUIDE (7899 ko)
Manual abstract: user guide PENTAX V-227
Detailed instructions for use are in the User's Guide.
[. . . ] TOTAL STATION
V-200
MANUAL
BASIC PROCEDURES POWER TOPO EXPRESS
SERIES
PENTAX Industrial Instruments Co. , Ltd.
2-36-9, Maeno-cho Itabashi-ku, Tokyo 174-0063 Japan Tel. +81 3 3960 0502 Fax +81 3 3960 0509 E-mail: international@piic. pentax. co. jp Website: www. pentax. co. jp/piic/survey www. pentaxsurveying. com
Ahead of Vision
Total Surveying Solutions
Basic Procedures
for Total Station V-200Series
The description concerning the reflectorless function in this manual is applied to only V-227N.
PENTAX Industrial Instruments Co. , Ltd.
3
CONTENTS
General Precautions regarding safety Warning Usage Precautions 1 Basic Operation 1. 1 Names of parts 1. 2 Unpacking and packing 1. 3 Standard equipment 1. 4 How to change the battery 2 Display and Keyboard 3 Preparation for Surveying 3. 1 Centring and Levelling of the Instrument 3. 2 Optical plummet 3. 3 Levelling with circular vial 3. 4 Levelling with the plate vial 3. 5 Eyepiece adjustment 3. 6 Target sighting 3. 7 Attachment and detachment of tribrach 4 Turning the Power On 4. 1 Turning the power on and off 4. 2 Adjusting LCD contrast 4. 3 Adjusting illumination brightness 4. 4 Adjusting reticle illumination 5 Angle Measurement 5. 1 Measuring an angle 5. 2 Resetting the horizontal angle to 0 5. 3 Holding the horizontal angle 5. 4 Inputting an arbitrary horizontal angle 5. 5 Displaying the % slope of the vertical angle 5. 6 Changing the horizontal angle from clockwise to counterclockwise 6 Distance Measurement 6. 1 Target setting 6. 2 Distance measurement 7 Correction Mode 7. 1 Changing the prism constant 7. 2 Changing the temperature 7. 3 Changing the atmospheric pressure 7. 4 Changing the ppm value 8 8 10 12 12 13 14 14 16 18 18 18 19 19 19 20 21 21 21 21 22 22 22 22 22 23 23 24 25 25 25 26 27 27 28 28 29 >>
4
CONTENTS
>> 8 Settings 8. 1 HELP 8. 2 PRISM CONST 8. 3 ATM CORR 8. 4 SHOT COUNT 8. 5 CRV/REF CORR 8. 6 ATM CORR DISP 8. 7 MIN UNIT ANG. 8. 10 AUTO OFF 8. 11 EDM OFF 8. 12 COMPENSATOR 8. 13 ATM UNIT 8. 14 DIST UNIT 8. 15 ANG UNIT 8. 16 SETUP COM. 9 Data Collector 10 Checks and Adjustments 10. 1 Plate Level 10. 2 Circular Vilal 10. 3 Vertical reticle 10. 4 Perpendicularity of line of sight to horizontal axis 10. 5 Vertical 0 point error 10. 6 Optical plummet 10. 7 Offset constant 10. 8 The EDM beam axis 11 Appendix 11. 1 Warning and Error Messages 11. 2 Atmospheric Correction 11. 3 Calculation Formula 11. 4 Distance Range 11. 5 Specifications 11. 6 Notice 11. 7 Labelling 29 30 30 30 30 30 31 31 31 31 31 31 31 32 32 32 32 33 33 33 34 34 35 36 36 37 37 38 38 39 39 41 42 43 44 >>
5
CONTENTS
>> Power Topo Express Display and keyboard 1 Introduction 1. 1 Introduction 1. 2 Before using the Power Topo Express manual 2 Accessing Power Topo Express 3 File Manager 3. 1 Information of the remaining memory available 3. 2 Creating a new Job 3. 3 Selection of a Job name 3. 4 Deletion of a Job name 3. 5 All Clear 4 Measure 4. 1 Station setup [By Rectangular Coordinates] 4. 2 Station Orientation 4. 3 Measuring 4. 4 Point Code 4. 5 Remote, Offset, Station, and H. [. . . ] · The same Point Name of the plural polar points can be saved.
50
2. ACCESSING POWER TOPO EXPRESS
2. 1 How to access Power Topo Express
To access the V-200 Special Functions of Power Topo Express, perform the following procedures: a. The Mode A screen appears automatically after a while.
MODE A
H. angle H. dst. V. dst.
MEAS
123° 45' 25''
TARGET
0 SET
DISP
MODE
c. V. dst.
S. FUNC
123° 45' 25''
ANG SET
HOLD
CORR
MODE
d. Press
to view the Functions of Power Topo Express on the screen.
Power Topo Express
1. STAKEOUT CALCULATION RDM TRANSFER PREFERENCE
Select one of the following functions by toggling through the menu: 1. FILE MANAGEMENT MEASURE VIEW&EDIT FREE STATION STAKE OUT
51
6. 9.
CALCULATION RDM TRANSFER PREFERENCE .
The selected function is highlighted, access it by pushing enter
3. FILE MANAGER
The Data storage memory status, creating a new Job name and the Selection and Deletion of a Job name are executed by this function. FILE MANAGEMENT" with or and press to view the FILE MANAGEMENT screen.
FILE MANAGEMENT
1. INFORMATION CREATE SELECT DELETE ALL CLEAR
3. 1 Information of the remaining memory available
Press to view the INFORMATION screen.
INFORMATION
Memory free: 93 % Current job: PENTAX 1004 Point saved
The remaining memory available and a JOB name are displayed on the screen. The default Job is called "PENTAX" and therefore, by default, the job name "PENTAX" is displayed. Press to return to the FILE MANAGER menu.
52
3. 2 Creating a new Job
Select "2. CREATE" with or and press to view the JOB NAME INPUT screen.
INFORMATION
ABCDEFGHIJKLMNOPQRSTUVWXYZ abcdefghijklmnopqrstuvwxyz 0123456789. , ?!()":;+-*/&=%#
BS
CLEAR
ACCEPT
· The Job name input method can be selected by the "Input method selection" of "9. The "Full template" input method is selected by default (see above sample). The "Divided template" input method looks like this:
JOB NAME INPUT
ABCDEFGHIJKLMNOPQRSTUVWXYZ
BS
CLEAR
ACCEPT
The "Matrix system" input method:
R1 R2 R3 R4 R5
: : : : :
1Aa. 9Ii' QqRr XxYy CLR
5Ee# 0Jj% SsTt Zz/= ret.
R1
R2
R3
R4
R5
· If a new Job is created, the new data are stored in this new Job.
3. 3 Selection of a Job name
Select "3. SELECT" with or and press to view the JOB SELECTION screen.
JOB SELECTION
1. JOB LIST SEARCH" and press to view its screen.
JOB LIST SEARCH
1. Select your desired Job name and press
to confirm your selection.
3. 3. 2 Selection by a Job name input
Select "2. JOB NAME SEARCH" by pressing .
· The JOB NAME SEARCH uses your input to search the entire job list. [. . . ] REMOTE METHOD" using or , and press to view the REMOTE or and METHOD selection box. Select the preferred remote method using press to confirm.
REMOTEMETHOD
1. FULL TEMPLATE INPUT METHOD:ROTATED PLANE ACTION METHOD: PROCESS TYPE REMOTE METHOD: FIXED PLANE
ACCEPT
114
1. Cylinder face The Remote measurement is performed on the inner surface of the vertical cylinder.
2. [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE PENTAX V-227
Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual PENTAX V-227 will begin.